Structural drying

Drying is verified against a target at marked points, logged daily, and closed when every point meets it.

Air movers ringing a stripped room with the baseboards off, and a dehumidifier draining into a bucket in the middle.
FIG. S — DRY · METRO VANCOUVER

Dry by day 5

Readings to target

Surfaces read dry days before cavities do. Stopping here is where callbacks, odour, and mould come from.

Day 0

24.1%

Extraction complete, equipment set, first readings logged

Day 1

21.8%

Readings at marked points, plan adjusted

Day 2

18.4%

Surfaces read dry. Cavities do not.

Day 3

15.2%

Cavity readings approaching target

Day 4

12.9%

One point still above target — equipment stays

Day 5

11.6% · target

Target met at every point. Equipment out, log closed.

On the job

Technician carrying an air mover into a stripped room, more fans and an extension lead stacked by the door.
FIG. A — ARRIVAL
Air movers ringing a stripped bedroom with a dehumidifier draining into a bucket in the middle of the floor.
FIG. B — IN PROGRESS
Technician holding a thermo-hygrometer up to take an ambient reading, clipboard under his arm and a dehumidifier running behind.
FIG. C — READING

Spec plate

  • IICRC S500 psychrometrics
  • Air movers and dehumidifiers
  • Daily moisture log until target

Questions

How long does structural drying take?

Many residential losses close in three to five days when extraction is prompt. Cavities lag surfaces. We do not pull equipment because the floor feels dry.

What is a drying log?

A record of moisture readings at marked points, each day, until every point meets the target. You can ask for it. We publish the method because it is how we close jobs.

Why not stop when surfaces read dry?

Surfaces read dry days before cavities do. Stopping there is where callbacks, odour, and mould come from.

Do you follow IICRC S500?

Yes. Equipment count and placement follow IICRC S500 psychrometrics for the space, not a guess. Ask for the crew's certification numbers when we arrive.

Will hardwood survive?

Often, if we reach it before cupping sets. Rescue mats and injected drying are on the rate card. Some floors still need refinish after they dry flat.

What does drying cost?

Air movers start at $54.55 per day, dehumidifiers at $158.40, capped at five days without written approval. Full card on the pricing page.