Day 0
24.1%
Extraction complete, equipment set, first readings logged
Indexed and complete
Our overnight and weekend rates are not discounted. Someone has to be awake, insured, and equipped at 3am, and that costs what it costs. We would rather charge properly for nights than promise a cheap one we cannot staff.
Dry by day 5
Surfaces read dry days before cavities do. Stopping here is where callbacks, odour, and mould come from.
Day 0
Extraction complete, equipment set, first readings logged
Day 1
Readings at marked points, plan adjusted
Day 2
Surfaces read dry. Cavities do not.
Day 3
Cavity readings approaching target
Day 4
One point still above target — equipment stays
Day 5
Target met at every point. Equipment out, log closed.
Every charge that can appear on your invoice is on this page. If it is not listed here, you will not be billed for it. No fuel surcharge. No contractor fee. No administrative add-on.
Drying equipment is billed to the day your readings hit target, capped at five days. If your building needs longer, we show you the readings and you approve the extension before day six.
Emergency mitigation proceeds immediately. Everything after it is authorised in writing before work starts. Rebuild is quoted per property after dry-out, not from this card.
These are our rates across Metro Vancouver. A job in this area is priced the same as one downtown. What changes by area is how fast we get there. All rates are shown before GST. Last updated September 2026.
| Item | Rate |
|---|---|
| Emergency call-out, minimum | $400.00 |
| Non-emergency / inspection call-out, minimum | $200.00 |
| Item | Rate |
|---|---|
| Mini air mover | $39.60 |
| Air mover | $54.55 |
| Axial fan | $68.65 |
| Dehumidifier, standard | $158.40 |
| Dehumidifier, high capacity | $286.00 |
| Air scrubber | $73.05 |
| Air scrubber, commercial | $109.35 |
| Hardwood floor rescue mat system | $187.90 |
| Injected drying system | $146.10 / 90 LF |
Worked example — six air movers and two dehumidifiers, five days: $3,220.50, capped there without written approval.
| Item | Rate |
|---|---|
| General labourer | $49.55 / hr |
| Flood technician | $87.40 / hr |
| Water extraction specialist | $90.15 / hr |
| Supervisor / project manager | $92.00 / hr |
| Hazmat technician | $100.30 / hr |
| Skilled labourer | $120.50 / hr |
| Contents / cleaning specialist | $52.60 / hr |
| Item | Rate |
|---|---|
| Weekend / statutory holiday | $80.79 – $196.50 / hr |
| Overnight emergency dispatch | $142.50 – $225.00 / hr |
| After-hours extraction specialist | $147.00 / hr |
| After-hours supervisor / project manager | $150.00 / hr |
| Item | Rate |
|---|---|
| Category 3 response | $163.50 – $300.00 / hr |
| Category 3 demolition | $250.00 – $300.00 / hr |
| Bio wash | $2.00 / sq ft |
| Item | Rate |
|---|---|
| Antimicrobial application | $0.23 / sq ft (min. $30 under 120 sq ft) |
| Post-flood selective demolition | $207.00 / hr |
| Emergency post-flood demolition | $207.00 – $276.00 / hr |
| Demolition labourer | $59.80 / hr |
| Debris removal | $138.00 / cu yd |
| Dumpster, 20 / 30 / 40 yd | $414 / $506 / $598 per week |
| Fuel surcharge | Not charged |
| Contractor fee | Not charged |
Insurance branch: how a file is assembled ·without a claim
Every charge that can appear on a mitigation invoice is on this page. Rebuild is quoted after dry-out. Insurance programme work uses insurer rates, not this card.
Our overnight and weekend rates are not discounted. Someone has to be awake, insured, and equipped at 3am, and that costs what it costs. We would rather charge properly for nights than promise a cheap one we cannot staff.
Not inside Metro Vancouver. Burnaby and Richmond use this card. Response time changes by tier, not the price.
Five days without written approval. If readings are still above target, we show you and you approve day six.
No. No contractor fee. No administrative add-on.
Yes. See without a claim. This card is for that work.
We answer 24/7 — a person, not a service. If you would rather not talk, tell us what happened in four taps and we will call you.