Air movers, a dehumidifier, and an air scrubber running along the soaked corridor of a Burnaby low-rise.
FIG. 14 — DAY 1 · BURNABY LOW-RISE, 3 UNITS

multi-unit

Burnaby stack leak

A third-floor stack wet two units below and the corridor. Board access at 2am. Daily log until day 5. Same crew through the drywall.

LossStack leak, third floor
Property1981 three-storey strata
Category1 degrading to 2
Affected3 units, corridor, 1,140 sq ft
Call received02:04
On site02:51
Equipment10 air movers, 3 dehumidifiers, 1 air scrubber
Dry byDay 5

Multi-unit losses are sequencing, not just pumps. We mapped wet units, contained the corridor, and extracted before the morning peak in the elevator.

The drying log is what the board and the adjuster both get. Surfaces misled on day 2. We kept equipment until cavities met target.

Who pays inside a strata is a legal question. We document. We do not give legal advice. See buildings / who pays.

Moisture readout

Day 0

26.0%

Three units opened, equipment set

Day 2

19.1%

Corridor dry to touch, cavities not

Day 5

11.8%

Target met at every point

Dry by day 5

Readings to target

Surfaces read dry days before cavities do. Stopping here is where callbacks, odour, and mould come from.

Day 0

24.1%

Extraction complete, equipment set, first readings logged

Day 1

21.8%

Readings at marked points, plan adjusted

Day 2

18.4%

Surfaces read dry. Cavities do not.

Day 3

15.2%

Cavity readings approaching target

Day 4

12.9%

One point still above target — equipment stays

Day 5

11.6% · target

Target met at every point. Equipment out, log closed.

Still wet? Call.

We answer 24/7 — a person, not a service. If you would rather not talk, tell us what happened in four taps and we will call you.